ESCAPE EQUIPMENT. CLEAR REQUIREMENTS.
Contact

FLEET SUPPLY · PROJECT PROCUREMENT

Prepare your fleet purchase.

A fleet or project enquiry can bring several purchasing lists into one conversation while preserving the differences between vessels, sites and equipment. Start with a destination-based schedule and identify the decisions that need separate approval.

Prepare an equipment enquiry

Enquiries are open. Supplier and provider arrangements are being established; all availability requires confirmation.

Escape equipment and cartons in a marine logistics workspace.

FREE PURCHASING TOOL

One line per item and destination.

Download a blank CSV list for Excel, Numbers or another spreadsheet. Keep your file locally and copy the relevant details into the optional bulk-enquiry section. This website does not accept file uploads.

Group the request by destination

Provide quantities for each vessel, installation or receiving location. Include an internal purchasing reference and identify who can approve changes. If the schedule is still developing, distinguish confirmed quantities from estimates so a later quotation does not present planning assumptions as firm requirements.

Keep configurations and documents traceable

List the specified model or part number against each line, with any required certificates, instructions and language needs. Separate operational devices, trainers and accessories. Where different configurations are involved, identify which substitutions may be considered and who is responsible for evaluating their acceptability.

Describe the receiving arrangements

State preferred delivery windows, receiving hours, site or port-agent contacts and any known access restrictions. Identify whether items would be consolidated or sent to multiple destinations. Freight terms, partial deliveries and any time-sensitive handover must be confirmed in a specific quotation, not inferred from this page.

Scope related support separately

Flag familiarization, practice equipment and service questions as distinct workstreams, with their own locations and timing. Ask for a written scope showing included items, exclusions and unresolved points. Supplier and provider arrangements remain under development, so no stock allocation, national service capacity or delivery date is promised.

Public-sector and project specifications

Include the purchasing reference, requested part number, NSN and manufacturer NCAGE when specified. Identify the required documents and who can accept an alternative. EEBD.ca accepts procurement enquiries; no approved public-sector supplier status or compliance with a particular tender is represented.

Remaining life and traceability

State any minimum remaining shelf-life requirement at delivery, together with manufacture and expiry dates, serial or batch records and release documents required. These details must be verified with the supplier for the actual units proposed.

One-time, staged or forecast deliveries

Separate firm quantities from annual forecasts. Use one line for each device and destination, with required receiving dates and freight responsibilities to confirm. A forecast does not allocate stock or constitute an order.

Build a replacement register before asking for prices

Use one record per unit or traceable batch: vessel or site, storage position, exact model, serial or lot reference, labelled dates and responsible contact. Keep the manufacturer’s service instructions with the record. Flag missing information for review instead of treating an unknown date as evidence that a device is fit for use.

Plan a handover for every destination

For each port or site, distinguish the required receiving date from the vessel sailing date. Confirm who can accept delivery, the receiving address, opening hours and any agent or warehouse handover. Use a fallback contact and record who approves changes if the itinerary moves. These are planning details; an enquiry does not confirm a delivery slot.

Reconcile the delivery with the purchase list

Prepare a receiving checklist before shipment: quantities, exact item identifiers, required documents, traceability records and any agreed remaining-life condition. Record discrepancies and refer them to the supplier and the person responsible for equipment acceptance. Keep packing and document references together for future replenishment.

Common questions

Can a fleet enquiry cover multiple Canadian ports?

Yes. Give one destination line for each port or receiving site, with quantities and dates. Freight, availability and receiving arrangements need confirmation for each destination.

How should we show annual demand?

Separate firm purchase quantities from planning estimates and optional future deliveries. Include the forecast period and label changes clearly. A forecast is not a stock reservation or an order.

Should trainers be counted as operational units?

Keep them on separate purchasing and inventory lines with their own identifiers. A training unit is not a substitute for an operational escape device.

START WITH YOUR REQUIREMENTS

Have a model number or an equipment list?

Bring the specification. We’ll help define the next conversation.

Prepare an equipment enquiry